|
timber fence
Job No. 42807Buyer or bidder sign in for status update
Detailed Description lap approx 15 lm hills district supply and install
Purpose of the fence:
Boundary of property
Required fencing material: Pine
Required style of fence:
Lapped paling
Length of fence (in metres):
15
Preferred height of fence (in centimetres):
180
Number of vehicle gates:
none
Number of pedestrian gates:
none
Preferences for the gate(s):
<none>
Longest walking distance from truck to work site/ fence (in metres):
20
Removal of old fence:
No
If yes, length of old fence (metres) and type:
<none>
List of obstacles to work around:
some small trees
Terrain/ environment (flat, steep, mixed):
Mixed grade
Foundation on which fence is to be built:
Clean top soil
Supplier to provide all materials/ equipment. The buyer is looking for quotes for budgeting and planning at this stage only. The buyer would like this job to be done at some point between 24 Nov 2011 and 05 Dec 2011. Sorry, buyer did not provide any images. Bid on this job Job is closed. confidential. |

