|
Erection of timber fence- residential property
Job No. 14747Buyer or bidder sign in for status update
Detailed Description Require a wooden boundary fence to be erected on the left hand side of property. Also require a single gate on both sides of property. No fence to be removed. Easy access. One Gum tree within 2m of fence erection. Residential property. Flat terrain. To be erected in front of existing retaining wall. Fence foundation- clay and top soil .
Purpose of the fence:
Boundary of property
Required fencing material: Pine
Required style of fence:
Lapped & capped paling
Length of fence (in metres):
33
Preferred height of fence (in centimetres):
180
Number of vehicle gates:
<none>
Number of pedestrian gates:
2
Preferences for the gate(s):
<none>
Longest walking distance from truck to work site/ fence (in metres):
<buyer did not use this form>
Removal of old fence:
<buyer did not use this form>
If yes, length of old fence (metres) and type:
<none>
List of obstacles to work around:
<none>
Terrain/ environment (flat, steep, mixed):
<buyer did not answer this question>
Foundation on which fence is to be built:
<buyer did not answer this question>
Supplier to provide all materials/ equipment. The buyer is ready to hire. The buyer would like this job to be done at some point between 11 Dec 2009 and 30 Dec 2009. Sorry, buyer did not provide any images. Bid on this job Job is closed. confidential. |

